Get a campground license for a new business or a change of ownership with these five steps. Ensure you review all relevant health and safety manuals and codes.
STEP 1 — COMPLETE THE CAMPGROUND LICENSING PACKET
Download the following materials, or call the Office of Health Protection at 605-773-4945 to request a packet.
- Administrative Rules of South Dakota 44:02:14
- Department of Health License Application
- Campground Facilities Plan Review Questionnaire
- Water Recreational Facilities (pools, spas) Plan Review Questionnaire
- Recommended Standards for Swimming Pool Design and Operation
- Suggested Health and Safety Guidelines for Public Spas and Hot Tubs
STEP 2 — MEET REQUIREMENTS
-
South Dakota Codified Law 34-18-23 requires campgrounds to notify the department of construction and alteration projects.
-
30 days before construction starts, submit a scaled drawing of the campground to the Office of Health Protection (recommended scale 1/8" = 1 foot).
-
Complete the plan review questionnaire and submit it with the plan to:
SD Department of Health - Office of Health Protection - 600 E. Capitol - Pierre, SD - 57501-2536
-
-
If the establishment uses private sewer or water systems, they must be approved by the South Dakota Department of Agriculture and Natural Resources, 605-773-3351.
-
Complete, notarize, and submit the application with the correct fee 30 days before completion of construction to:
SD Department of Health - Office of Health Protection - 600 E. Capitol - Pierre, SD - 57501-2536
STEP 3 — DEPARTMENT OF HEALTH REVIEW
- Department reviews the layout plan and plan review questionnaire.
- Department sends a written notification regarding approval or changes required.
- Department approves the campground plan once it complies with ARSD 44:02:14.
Questions? Contact a Health Protection Advisor in your region.
STEP 4 — STATE INSPECTION
During construction and before the business opens, the department conducts an onsite inspection to determine compliance with administrative rules.
STEP 5 — APPROVAL FOR LICENSING
The department issues a campground license once the application is processed, the plan review is completed and the final inspection determines compliance.
ADDITIONAL INFORMATION LINKS
Governor's Office of Economic Development, Business Start-Up information
South Dakota Plumbing Commission